Saturday, February 25th, 2006 | Author: Administrator
Just some more pics of the Z28 Front Mount Intercooler getting installed. I can’t wait to get this thing back. It should be bad ass. I have to wait a little longer to get it though. It received a new Spec stage 3 clutch and steel flywheel. I also gave it a new set of Comp cams 918 valve springs and chrome moly pushrods.
Category: car

Recent Comments